Maine

Maine


Maine

Veterans Memorial Bridge / Design-Build sticky icon

MSE Precast Abutment

As the gateway to Maine's largest metropolitan area, Veterans Memorial Bridge (VMB) carries the Veterans Memorial Parkway and more than 22,000 vehicles a day between Portland and South Portland.  In 2009 the Maine DOT issued a design-build RFP to replace the narrow and deteriorating original span and requiring a 100-year service life for the new structure.  The winning team comprised Reed & Reed (Woolwich, ME; general contractor), T.Y. Lin International (Falmouth, ME; bridge designer), GZA Geoenvironmental (Portland, ME; geotechnical engineer) and R. J.